FM 10-500-3 PDF

0 Comments

Prepare and install one GE cargo parachute or three G cargo parachutes to the A cargo bag according to FM /TO 13C FM /TO 13C, 21 August , is changed as follows: 1. New or changed material is , c1. , c1. ARMY FM (FM ). AIR FORCE TO . This publication supersedes FM /TO 13C, 31 October FM /TO 13C

Author: Metilar Kazrajora
Country: Egypt
Language: English (Spanish)
Genre: Sex
Published (Last): 10 November 2017
Pages: 33
PDF File Size: 3.4 Mb
ePub File Size: 10.26 Mb
ISBN: 383-3-32582-871-2
Downloads: 59663
Price: Free* [*Free Regsitration Required]
Uploader: JoJoshicage

T Center a drum on honeycomb stack J. Lash the drums together as shown in Figure Projected publication date – Spring Please make this change where it applies throughout the manual. Starting at the front of the platform, number the clevises bolted to the right side from I through 1 4 and those bolted to the left side from I A through J4A. Further, we will continue to maintain a range of airdrop capabilities to support all contingencies throughout the Army. Preparing Containers Prepare eight milk-dispensing containers as shown in figure T Cut two by 3i-inch pieces of honeycomb for stack 2, Center the stack 7 Inches from stack I.

Only those loads that specifically require this system are authorized use of this system. Lashing Number Clevis Number Instruction? Place a foot cargo extraction parachute and a foot 3-looptype XXVI nylon webbing extraction line on the load for installation in the aircraft.

Through the front shackle of the second drum.

Seal the end of the container with 3-inch tape. FigurePlywood and honeycomb secured CI.

FM Titles (Version , ) Remarks A B

This system is not authorized for use IAW ref d, above. It is made up of a fiber board box and a plastic bag insert. Forty containers can be delivered in one A cargo bag, eight contain- ers can be delivered in one A cargo bag, and containers can be delivered in four A cargo bags. It is made up of u fiherboard box and a plastic bag insert.

  BROCADE 300 FC8 PDF

10-5003 the cap on the bag. Evenly space the other two pieces between the end pieces to form the second bycr. Filled with gallons of water, each drum weighs pounds.

The point of contact for this action is Mr. Water containers placed and bound. Through the front shackle of the first drum. Seal the dosed end with 3- inch tape, Make sure that the tape extends at least 6 inches down the sides of the container.

Y Raise the suspension flings to their full length using a lifting provision not shown.

Installing and Safetymg Suspension Slings Install four large suspension clevises and four foot 2 -loop p type XXVI nylon webbing slings to the tandem links as shown in Figure Draft memorandum specifically states that the fk support the need for a low level airdrop capability. A copy of this manual must be available to the joint airdrop inspectors during the before- and after-loading inspections.

Placing Extraction Parachute Place the extraction parachute as 10-50-3 below.

Install a tandem link on the front of each platform side rail using holes I k 2, and 1, 3. Through the front shackle of the third drum. Twenty-four 1 10-50-03 plastic canteens filled with 6 gallons of water weigh 54 pounds.

FM Titles (Version 5.7, 6-21-01) Remarks A B

Description of Load The 6-gailon milk-dispensing container is used as an expandable container for potable water. Cargo bag and ply umod placed. Equipment required for rigging three gallon water drums for low-velocity airdrop on an 8-foot, type V platform National Stock iliii! Preparing and Positioning Honeycomb Prepare and position the honeycomb on the platform as shown in Figure 5.

  AMIANO MARCELINO HISTORIA PDF

Make sure that the tape extends at least G inches down the sides of the container. Center the A cover on the sling assembly with the outside of the cover down. Wrap four bands of tapa twice around each container as shewn.

Adhesive, 2-in Filament, reinforced, 1 -in Webbing: Y Attach the actuator assembly to the mounting brackets. Roger Hale, DSN Through the rear shackle of the first drum. Preparing Inner Container a.

Each drum weighs pounds when empty. Also with this change, the destruction notice shown below must be added to the cover of the basic manual. Bind the stacked containers and boards together with three 1 6-fool lengths of type X nyton webbing, three load binders, and six D rings.

Install a tie-down clevis on bushings I and 2 on each front tandem link 5. One case of zip-top cans weighs 39 pounds. Place the skid on a level surface. Drums positioned und lashed together CI. Figure A cargo bag prepared Water, drinking, twenty-four 1-quart plastic canteens Weight; fifi pounds Cube: Those rigging procedures which have dual application with the type V platform are still valid for the type V platform.

Equipment Required The equipment needed to prepare and rig the water containers is listed in table Army Aviation Troop Command.